港口简介

news

New berths in Shidao New Port were approved for opening to the outside world

Since 2010, Shidao Xingang has invested 1.8 billion yuan to build 7 berths of more than 10,000 tons, supporting breakwaters and 50,000-ton waterway projects. In August 2016, two 20,000-ton and one 50,000-ton berths were completed in advance, with a berth length of 661.5 meters and a designed annual capacity of 3.13 million tons.

On July 21, three new 10,000-ton berths in Shidao Xingang were officially opened, and passed the inspection and acceptance of the relevant departments of Shandong Province.

The provincial port office participating in the acceptance inspection, together with the Qingdao Customs, the Provincial Public Security Frontier Defense Corps, the Shandong Inspection and Quarantine Bureau, the Shandong Maritime Safety Administration, and the Provincial Port and Shipping Bureau, conducted an on-site inspection of the proposed berth site at Shidao New Port and listened to relevant work. Case report. Fully affirmed the preparations for the opening of the three new 10,000-ton berths in Shidao New Port and signed the acceptance.

This article URL:http://www.cnsdnp.cn/en/news/378.html

Related tags:新闻关键词